We design & install the very best in digital technology, and provide lower-cost annual Testing & Certification with our radio-coverage systems
800 MHz System Testing
 
 
A
company
THE ANNUAL TEST
usually requires certification that the radio coverage is compliant, the repeater(s) are working as designed, and the battery back-up system is healthy.
THE INTERNATIONAL FIRE CODE AND MOST MUNICIPALITIES REQUIRE THAT DESIGN DOCUMENTS AND ALL TESTS SHALL BE DOCUMENTED AND SIGNED BY A PERSON IN POSSESSION OF A CURRENT FCC GENERAL RADIO TELEPHONE OPERATOR LICENSE AND A CERTIFICATION BY THE MANUFACTURER OF THE EQUIPMENT BEING INSTALLED. 
THE FIVE YEAR TEST
generally requires radio coverage testing of the entire building, testing of repeater(s) or bi-directional amplifiers with gain readings, and full-term battery back-up system performance trial.
ASK YOUR FIRE OFFICIAL FOR COMPLETE DETAILS
ASK YOUR FIRE OFFICIAL FOR COMPLETE DETAILS
Components
 MADE IN THE USA
used where possible
Questions? Call Bill at
425-246-3215
silvernail@800MHzGroup.com
HOME
PAST PROJECTS
FAQ'S
CERTIFICATION
DESIGN
CONTACT US
CURRENT PROJECTS